AJK Offroad Milwaukee Packout Mounts For Polaris RZR Turbo R Models
Setup With The Best Storage Solution Around, Laser CNC Machined RZR Turbo R Packout Mounts Allows Any Milwaukee’s Storage Options Black, Turbo R Tool Box Mount
This mount uses existing mounting holes so no drilling is required. You can purchase our puck system to bolt this packout mount directly to your bed.
This is a very simple install.
We CNC Laser cut our Milwaukee Packout Mount in house from 10 gauge P.O. steel then powder coat it black.
Milwaukee has many different options of tool boxes, each Milwaukee box is stackable and offers different size options. They even offer a cooler.
This Kit Does Not Come With Mounting Hardware, If Hardware Is Needed Please Add Tie Down Puck System.
No Milwauke Boxes Included, Must Purchase the Milwaukee Solutions Separately.
Features:
- Perfect Storage Solution
- Easy Install
- Many Milwaukee options
- Easy to install
- Made in USA
Add Tie Down Pucks:
You Can Add On The Machined Puck Tie Down’s For A More Secure Mounting Solution, These comes with Machined Top And Bottom Pucks With Nylon Washers for security.
We CNC machine the plug from 6061-T6 Billet Aluminum and all the hardware is Zinc Plated for corrosion resistant. We use 5/16″ diameter hardware for plenty of strength
Limited Warranty
AJK Offroads products are warranted to be free of defects in material and workmanship under normal use (some light scratches may be present from the manufacturing process).
Our sole liability under this warranty is limited to replacing the defective product.
Any/all shipping costs are the responsibility of the customer.
This warranty shall not apply to any product which has been damaged by improper usage, accident, neglect, alteration,racing, or abuse.
In no event will we be liable for special or consequential damages to any buyer, user, or another person.
IN STOCK PARTS – Any items in current inventory we ship within 36-48 hours after order.
We currently only ship Monday through Friday, if you place the order over the weekend we will process it on Monday.
Current Fabrication or Production Run Parts
Currently anything listed on the site is traditionally stocked and ready to ship but there are times that we are currently in a production run and or waiting for powder coating, this could result in 5-10 Business day shipping
Lead Times define the maximum estimated amount of time required to prepare the item for shipping and may vary depending on product, volume of current orders, and/or build schedules. This includes fabrication, powder coating, packaging, and other preparation. In the event that Lead Times are delayed you will be contacted via email or phone call.
Lead Times DO NOT include shipping transit times.
All parts will be shipped as soon as possible after the initial Lead Time using your selected shipping method.
What others are saying
There are no contributions yet.