AJK Offroad Intake Vent Covers for Polaris RZR Pro XP, Pro R And Turbo R Models
Protect The Frog Skins On Your RZR Pro Intake Vents , Turbo R Intake Vents With These Precision Cut Protection Covers. Easy Install. Complete Set, Inside, Outside, Color Options
Our Breather Intake Vent Covers for your Polaris RZR Pro XP / Pro R / Turbo R are a great solution to protecting your Frog Skins.
We offer our vents in multiple colors that match your RZR.
Our Frog skin vent covers are CNC laser cut from .062 thick aluminum and then powder coated the color of your RZR.
We also offer our Intake Vent covers Raw aluminum for you custom build.
Each vent is supplied with self drilling screws and are very easy to install.
Features:
- Looks Great
- Fit RZR Pro XP / Pro R / Turbo R
- Easy Install
- Protects intake from damage
- Made in USA
Location Options
Choose whether you want to protect the inside, outside, or both making a complete set for your intake vents.
The inside set is two pieces for each side located on the side of the bed, protecting your frog skin from debris and your additional gear.
The outside set is one piece for each side with the AJK OFFROAD logo on to help protect from debris.
Limited Warranty
AJK Offroads products are warranted to be free of defects in material and workmanship under normal use (some light scratches may be present from the manufacturing process).
Our sole liability under this warranty is limited to replacing the defective product.
Any/all shipping costs are the responsibility of the customer.
This warranty shall not apply to any product which has been damaged by improper usage, accident, neglect, alteration,racing, or abuse.
In no event will we be liable for special or consequential damages to any buyer, user, or another person.
IN STOCK PARTS – Any items in current inventory we ship within 36-48 hours after order.
We currently only ship Monday through Friday, if you place the order over the weekend we will process it on Monday.
Current Fabrication or Production Run Parts
Currently anything listed on the site is traditionally stocked and ready to ship but there are times that we are currently in a production run and or waiting for powder coating, this could result in 5-10 Business day shipping
Lead Times define the maximum estimated amount of time required to prepare the item for shipping and may vary depending on product, volume of current orders, and/or build schedules. This includes fabrication, powder coating, packaging, and other preparation. In the event that Lead Times are delayed you will be contacted via email or phone call.
Lead Times DO NOT include shipping transit times.
All parts will be shipped as soon as possible after the initial Lead Time using your selected shipping method.
What others are saying
There are no contributions yet.