AJK Offroad Shift Gate For Honda Talon Models
AJK Offroad has designed our Honda Talon Shift Gate to shift in between gears effortlessly.
One side of the Shift Gate is from high to reverse gear while the other side is from low to reverse gear.
As soon as you slide your shifter out of park we have a smooth radius for your shifter to follow.
We have also designed our Honda Talon Shift Gate to have a little rest spot for neutral. From neutral you are able to shift from reverse, high, or low gear with one easy move.
Our Honda Talon Shift gate will bolt directly in the stock position with no modifications.
You Can Add On or Billet Aluminum Shifter Knob. Our Honda Talon Shift Knob looks great and is easy to install. Remove your old shifter knob and slide our billet aluminum shifter knob on and tighten 2 set screws for a secure fit.
- Why reuse your old shifter knob after you replace your shift gate. Our billet aluminum shifter knob is a must.
Features:
- Direct Bolt in / NO modifications
- Fits all Honda Talons
- Easy to Shift gears
- Radius pattern from park to neutral
- CNC Laser Cut
- Made in USA
- Powder coated black
Limited Warranty
AJK Offroads products are warranted to be free of defects in material and workmanship under normal use (some light scratches may be present from the manufacturing process).
Our sole liability under this warranty is limited to replacing the defective product.
Any/all shipping costs are the responsibility of the customer.
This warranty shall not apply to any product which has been damaged by improper usage, accident, neglect, alteration,racing, or abuse.
In no event will we be liable for special or consequential damages to any buyer, user, or another person.
IN STOCK PARTS – Any items in current inventory we ship within 36-48 hours after order.
We currently only ship Monday through Friday, if you place the order over the weekend we will process it on Monday.
Current Fabrication or Production Run Parts
Currently anything listed on the site is traditionally stocked and ready to ship but there are times that we are currently in a production run and or waiting for powder coating, this could result in 5-10 Business day shipping
Lead Times define the maximum estimated amount of time required to prepare the item for shipping and may vary depending on product, volume of current orders, and/or build schedules. This includes fabrication, powder coating, packaging, and other preparation. In the event that Lead Times are delayed you will be contacted via email or phone call.
Lead Times DO NOT include shipping transit times.
All parts will be shipped as soon as possible after the initial Lead Time using your selected shipping method.
What others are saying
There are no contributions yet.